In 2011 the sports fields of this private school were reconstructed. Nellis Construction was hired to provide the rough grading. Dozers with GPS grade control were used to put the ...
Nellis Construction was awarded the contract for the construction of a large storm water management pond in Milton, Ontario. This pond was designed to service the future industrial sites along ...
Grading of phase 2 & 3 of this Ajax subdivision began in April 2010. Topsoil was stripped, lots and roads were graded to the designed pre-grade. Due to the shortage ...
This subdivision in Thorold, Ontario was graded in 2009. The owner wanted the site graded by the fall of the year so that he could arrange for a sewer crew ...
Construction of 6 new soccer fields for the Town of Halton Hills, Ontario began in October 2009. Nellis Construction was retained to perform the earth work portion of this contract. ...
This ½ mile horse training track was constructed in Erin, Ontario in 2009. The owners requested a quote to reconstruct an existing track that was just short of ½ mile ...
Construction of the Fairway Road extension began in the fall of 2010. This project will connect Fairway Road in Kitchener to Kossuth Road in Cambridge. Over 2 kilometres of road ...
This farm driveway in East Garafraxa, Ontario was built in 2009 as an alternate access to a horse farm. Designing a driveway that would complement the landscape and be practical ...