Construction of this rural estate subdivision began in 2014. Topsoil was stripped and placed into piles to be used by the landscape crew. A storm water management facility was constructed ...
In July of 2012 Nellis Construction was contracted to excavate a drainage channel in Brampton called The Natural Heritage System. A temporary water diversion channel was built to keep the ...
In July of 2012 Nellis Construction was awarded the contract to strip 60,000 m3 of overburden from the next phase of this quarry operation. The overburden was loaded and hauled ...
This farm driveway in East Garafraxa, Ontario was built in 2009 as an alternate access to a horse farm. Designing a driveway that would complement the landscape and be practical ...
Construction of the Fairway Road extension began in the fall of 2010. This project will connect Fairway Road in Kitchener to Kossuth Road in Cambridge. Over 2 kilometres of road ...
This ½ mile horse training track was constructed in Erin, Ontario in 2009. The owners requested a quote to reconstruct an existing track that was just short of ½ mile ...
Construction of 6 new soccer fields for the Town of Halton Hills, Ontario began in October 2009. Nellis Construction was retained to perform the earth work portion of this contract. ...
This subdivision in Thorold, Ontario was graded in 2009. The owner wanted the site graded by the fall of the year so that he could arrange for a sewer crew ...
Grading of phase 2 & 3 of this Ajax subdivision began in April 2010. Topsoil was stripped, lots and roads were graded to the designed pre-grade. Due to the shortage ...
Nellis Construction was awarded the contract for the construction of a large storm water management pond in Milton, Ontario. This pond was designed to service the future industrial sites along ...