Fairway Road Extension

Construction of the Fairway Road extension began in the fall of 2010. This project will connect Fairway Road in Kitchener to Kossuth Road in Cambridge. Over 2 kilometres of road will be built as well as a much needed bridge over the Grand River. Nellis Construction was hired to strip topsoil and grade the future road allowance. Bridge abutments were put to grade on each side of the river, the west abutment was raised 11 metres to meet the future bridge profile while the east abutment had to be excavated to allow access to the bridge pier located near the river.