In July of 2012 Nellis Construction was contracted to excavate a drainage channel in Brampton called The Natural Heritage System. A temporary water diversion channel was built to keep the ...
Construction of the New City Park in Burlington, Ontario started in May of 2010. Phase one of the park consisted of grading 3 Soccer fields and a Storm Water Management ...
In 2011 the sports fields of this private school were reconstructed. Nellis Construction was hired to provide the rough grading. Dozers with GPS grade control were used to put the ...
Nellis Construction was awarded the contract for the construction of a large storm water management pond in Milton, Ontario. This pond was designed to service the future industrial sites along ...
Construction of 6 new soccer fields for the Town of Halton Hills, Ontario began in October 2009. Nellis Construction was retained to perform the earth work portion of this contract. ...
Construction of the Fairway Road extension began in the fall of 2010. This project will connect Fairway Road in Kitchener to Kossuth Road in Cambridge. Over 2 kilometres of road ...
This farm driveway in East Garafraxa, Ontario was built in 2009 as an alternate access to a horse farm. Designing a driveway that would complement the landscape and be practical ...