Site grading operations for this industrial lot in Kitchener commenced in 2020. Topsoil was stripped and stockpiled on-site for future reinstatement. Uncompacted fill was excavated and reengineered through placement of ...
Grading of this industrial lot in Milton began in 2019. Existing topsoil was stripped and exported off-site in preparation for site development. Two engineered water channels were constructed to manage ...
Site grading for this residential subdivision located in Brampton began in 2018. The scope of work included lot and road grading to prepare the area for future development. A stormwater ...
Site grading for the industrial park located in Acton commenced in 2017. The scope of the project included the construction of internal roads, lot grading to prepare for future development, ...
Site grading of this lake side condominium development located in Grimsby started in 2015. Loose soil placed by the previous owner had to be excavated, sorted and recompacted. The site ...
Reconstruction of this County Road began in 2016. Topsoil was stripped from the ditches. The road was then excavated and filled to match the new profile. Gravel was placed on ...
Construction of this rural estate subdivision began in 2014. Topsoil was stripped and placed into piles to be used by the landscape crew. A storm water management facility was constructed ...
In July of 2012 Nellis Construction was contracted to excavate a drainage channel in Brampton called The Natural Heritage System. A temporary water diversion channel was built to keep the ...
In July of 2012 Nellis Construction was awarded the contract to strip 60,000 m3 of overburden from the next phase of this quarry operation. The overburden was loaded and hauled ...
Construction of the New City Park in Burlington, Ontario started in May of 2010. Phase one of the park consisted of grading 3 Soccer fields and a Storm Water Management ...