Site grading of this lake side condominium development located in Grimsby started in 2015. Loose soil placed by the previous owner had to be excavated, sorted and recompacted. The site ...
Reconstruction of this County Road began in 2016. Topsoil was stripped from the ditches. The road was then excavated and filled to match the new profile. Gravel was placed on ...
Construction of this rural estate subdivision began in 2014. Topsoil was stripped and placed into piles to be used by the landscape crew. A storm water management facility was constructed ...
In July of 2012 Nellis Construction was contracted to excavate a drainage channel in Brampton called The Natural Heritage System. A temporary water diversion channel was built to keep the ...
In July of 2012 Nellis Construction was awarded the contract to strip 60,000 m3 of overburden from the next phase of this quarry operation. The overburden was loaded and hauled ...
Construction of the New City Park in Burlington, Ontario started in May of 2010. Phase one of the park consisted of grading 3 Soccer fields and a Storm Water Management ...
In 2011 the sports fields of this private school were reconstructed. Nellis Construction was hired to provide the rough grading. Dozers with GPS grade control were used to put the ...
Nellis Construction was awarded the contract for the construction of a large storm water management pond in Milton, Ontario. This pond was designed to service the future industrial sites along ...
Grading of phase 2 & 3 of this Ajax subdivision began in April 2010. Topsoil was stripped, lots and roads were graded to the designed pre-grade. Due to the shortage ...
This subdivision in Thorold, Ontario was graded in 2009. The owner wanted the site graded by the fall of the year so that he could arrange for a sewer crew ...