In 2011 the sports fields of this private school were reconstructed. Nellis Construction was hired to provide the rough grading. Dozers with GPS grade control were used to put the fields to grade.
1 519 853 0960
Construction of this rural estate subdivision began in 2014. Topsoil was strippe...
In July of 2012 Nellis Construction was contracted to excavate a drainage channe...
In July of 2012 Nellis Construction was awarded the contract to strip 60,000 m3 ...
Construction of the New City Park in Burlington, Ontario started in May of...
In 2011 the sports fields of this private school were reconstructed. Nellis Cons...
Nellis Construction was awarded the contract for the construction of a large sto...
Grading of phase 2 & 3 of this Ajax subdivision began in April 2010. Topsoil...
This subdivision in Thorold, Ontario was graded in 2009. The owner wanted the si...
Construction of 6 new soccer fields for the Town of Halton Hills, Ontario began ...
This ½ mile horse training track was constructed in Erin, Ontario in 2009. The o...
Construction of the Fairway Road extension began in the fall of 2010. This proje...
This farm driveway in East Garafraxa, Ontario was built in 2009 as an alte...